Resilience cannot be bolted onto a program at commercial scale. Anshul Gupte, Vice President of Pharmaceutical Development at PCI Pharma Services, explains why sponsors should make supply-aware choices from the earliest stages of drug product development.
The pharmaceutical supply chain has always demanded careful coordination. But in the years since the pandemic, disruption has moved from a contingency to a central development consideration. Sponsors now face greater scrutiny of where work is performed, how materials are sourced, whether specialist capabilities can be accessed when needed and how quickly a program can change course when an assumption no longer holds.
For development teams, the challenge is not simply to replicate the risk-management playbook used for commercial supply. Early-stage programs operate with scarce active pharmaceutical ingredient (API), evolving data packages, compressed timelines and a need to remain technically agile. A strategy that is appropriate for a validated, high-volume commercial product can be impractical - or actively counterproductive - during formulation and process development.
The answer is not to sacrifice speed for theoretical security. Instead, sponsors and CDMOs need to build resilience into the choices that determine how a product is formulated, analyzed, manufactured and transferred. Doing so requires a realistic view of the constraints of early development, open communication between partners and a focus on avoiding avoidable single points of failure.
A changed supply-chain landscape
One visible post-pandemic shift has been a stronger interest in onshoring and regional manufacturing. Sponsors increasingly ask where development and manufacturing sites are located, with US-based capacity often a preference for US programs. This trend is most pronounced in late-stage and commercial supply, where proximity, regional continuity and security of supply can be decisive considerations.
However, location is only one element of resilience. In early development, technical expertise, relevant capabilities and program timelines often carry greater weight than geography alone. A development partner needs to be able to solve formulation, process and analytical problems rapidly and appropriately, rather than simply satisfy a preference for a particular region.
That distinction matters because resilience is not synonymous with onshoring. A geographically local supplier may still create risk if it lacks adequate capacity, specialist expertise, qualified alternatives or robust internal contingency arrangements. Conversely, a CDMO with an integrated, well-harmonized network may offer a stronger safety net by being able to pivot work between suitable sites when disruption affects the primary location.
The post-pandemic environment has also reinforced expectations around speed. Accelerated pathways existed before COVID-19, but the pandemic demonstrated that parts of development can move faster when there is sufficient focus, collaboration and urgency. Those expectations have persisted. At the same time, continued activity in orphan diseases and smaller patient populations means many programs are designed for more targeted indications, often with an imperative to reach the clinic efficiently.
Quality by Design principles remain the foundation of sound development. What has changed is the operating context in which they are applied: development teams are asked to make robust decisions faster, while retaining enough flexibility to adapt as the product, process and supply chain mature. Artificial intelligence is also becoming part of the conversation, particularly in formulation and analytical development, as organizations consider where it can augment scientific decision-making. But the core objective remains unchanged: generate a product and process that are fit for purpose, understood and capable of progressing.
Build resilience in from the start
Supply resilience should be considered at the beginning of development because early technical decisions can constrain later options. The formulation, excipients, primary packaging, analytical strategy and manufacturing technologies selected during a phase-appropriate program all influence how readily a product can be scaled, transferred or supplied following a disruption.
There is an important difference between resilience in early development and resilience in commercial manufacturing. At commercial scale, the focus is typically on reproducibility, validated processes and operational excellence. Lead and backup sites, regional supply configurations and dual-sourcing strategies can be established around a stable process.
Early development has different priorities. Sponsors are usually managing limited API quantities and need a partner with technical agility, specialized knowledge and the ability to make timely decisions with incomplete information. It may not be feasible to manufacture equivalent batches at two sites: there may simply not be enough API, time or budget to support that approach. Equipment, teams and site-specific ways of working may also differ materially between facilities.
For that reason, early-stage resilience is often better defined as optionality. The goal is to retain credible alternatives - not necessarily to duplicate every activity. A CDMO network with appropriate backup sites, complementary technologies and shared technical know-how can provide a route to respond if the primary site encounters a problem. But those alternatives must be practical, scientifically justified and supported by compatible quality systems.
This is why mature development organizations benefit from close day-to-day collaboration between technical, procurement and supply-chain teams. Resilience cannot be a late hand-off to procurement. It needs to shape decisions when development teams are selecting materials and processes, and when they are deciding which activities to retain in-house or outsource.
Materials, methods and manufacturing choices
Once API availability is set aside – a responsibility that generally remains with the sponsor – the main development supply risks often sit in raw materials, excipients and primary packaging components. In terms of primary packaging components for OSD, this includes bottles, caps and blister materials., for sterile products, it includes vials, stoppers, crimps and related components. Availability, lead times, quality history and supplier concentration for these materials can all influence the ability to manufacture clinical supply on schedule.
Established CDMOs can reduce risk through internal material-management capability and supplier networks. This does not remove the need for planning, but it can prevent teams from repeatedly sourcing individual materials and facing long waits before a subsequent batch can be made. Formulation decisions should therefore be evaluated not only for their technical performance, but also for their downstream supply implications.
Standard, well-characterized excipients are often preferable when they can achieve the required product performance, because they generally offer more established sourcing and a wider body of manufacturing experience. Novel or custom excipients may be essential in some cases, particularly when conventional approaches cannot meet the needs of the API or dosage form. The issue is not novelty itself; it is whether the resulting dependency has been recognized, assessed and actively managed.
Where a novel material is required, sponsors and CDMOs should understand its future supply profile early. They should examine supplier capacity, availability of alternatives, lead times, qualification requirements and the potential impact of a change. Project plans should include sufficient time to absorb foreseeable delays rather than assuming that a specialized component will always be available on demand.
The analytical strategy deserves the same level of attention. Decisions about which tests are performed in-house and which are outsourced can create hidden dependencies. Outsourced activities may include sterility testing, extractables and leachables studies, mass spectrometry and cell-based assays. These are often highly specialized and critical to release decisions. If the external laboratory cannot generate the required data, batch release and clinical timelines can be jeopardized.
Due diligence should therefore extend beyond technical competence. Sponsors and CDMOs need visibility of an external provider’s capacity, laboratory network, quality systems and backup arrangements. A specialized outsourced method may be scientifically appropriate, but its operational resilience should be assessed with the same rigor as the formulation or manufacturing process.
For sterile development, single-use systems are another important consideration. Bags, filters, connectors and related components are integral to many modern processes. Even when the formulation and process are sound, a lack of physical availability of these components can halt manufacturing. Working with qualified primary and backup single-use-system providers, understanding materials of construction and confirming API compatibility can reduce this exposure. It also enables more informed contingency planning if a preferred supplier experiences disruption.
Avoiding hidden single points of failure
Single points of failure are often created unintentionally during development, particularly when a program adopts a highly customized solution before evaluating more established options. A custom excipient, novel filter, unique piece of equipment or proprietary process may deliver a technical advantage, but can also anchor the program to a single supplier, site or capability.
The appropriate response is not to prohibit innovation. Some APIs and dosage forms genuinely require bespoke approaches. Instead, the development team should ask a disciplined set of questions before making that commitment:
- Is a standard, more widely available solution technically viable?
- Is there more than one qualified supplier or a realistic alternative material or technology?
- What evidence is needed to demonstrate equivalence if an alternative becomes necessary?
- What would be the impact of a supply interruption on development, clinical supply and later scale-up?
- Has the project timeline incorporated the additional uncertainty associated with the bespoke solution?
These questions should be revisited as the program progresses. A development approach that is sensible for an initial clinical batch may not be the best basis for later phases. Conversely, an apparently efficient early decision may cause significant friction if it prevents scale-up, technology transfer or access to other manufacturing sites.
Designing for flexibility requires balance. Early development must be phase appropriate: it should conserve API, protect time and support rapid progression to the clinic. Yet teams should still consider whether the selected manufacturing approach could be executed under GMP conditions and repeated at a larger scale. The question is not whether every early process can be commercial-ready from day one. Rather, it is whether the route chosen preserves a feasible path to a reproducible, scalable process.
Dual sourcing: valuable, but not automatic
Dual sourcing and regional manufacturing are often presented as straightforward resilience measures. In late-stage and commercial settings, they can be highly effective. A validated, reproducible process can be established at a lead site and a backup site, potentially in different regions, helping organizations manage a significant site interruption or regional disruption.
The same logic does not translate directly to early-stage development. First, API constraints can make parallel manufacturing unrealistic. A sponsor may not have enough material to run equivalent batches at two sites, and allocating scarce API to redundancy can delay the program’s primary objective: generating clinical supply and the data needed to make the next decision.
Second, comparable capability cannot be assumed. Two sites may differ in equipment, technical experience, quality practices, capacity and risk tolerance. A partner that is strong in early-phase development may not be the same partner best suited to late-stage or commercial manufacture. Only a limited number of CDMOs can support the full pathway from development through clinical supply to commercial manufacturing within one network.
There are also regional and regulatory considerations. Although expectations are substantially harmonized in many areas, regulatory agencies and organizations may take different views on risk, the timing of studies and the evidence needed to proceed. Cost structures and operational practices also vary by geography. A dual-source strategy must therefore be evaluated as a technical, quality, regulatory and economic decision - not simply a procurement choice.
The practical implication is that sponsors should distinguish between creating immediate duplication and creating transfer readiness. During early development, it may be more valuable to select platform-compatible technologies, document process knowledge carefully, identify future manufacturing options and understand what additional work a transfer would require. These measures build a more credible foundation for later redundancy without demanding premature duplication.
Partnership as a resilience mechanism
A resilient development program depends on how the sponsor and CDMO work together. The strongest relationships treat resilience as a shared objective, not as an obligation assigned to one party after timelines have been set.
That begins with early, transparent communication. Sponsors should share the expected clinical program, likely timing of future batches and their view of when a formulation needs to be locked. CDMOs should clearly explain the technical choices, capacity constraints and risks associated with those choices. Decisions should be made jointly, with both parties understanding the trade-offs.
For example, a phase-appropriate formulation may be selected because it conserves API, reduces cost and allows the program to enter the clinic faster. Those are legitimate and often compelling benefits. But the formulation or process may require further work before it can be scaled or transferred. This is acceptable when the risk is explicit, understood and jointly accepted; it becomes problematic when sponsor and CDMO hold different assumptions about whether the formulation is provisional or final.
Capacity planning is another critical area for shared visibility. A development process may rely on a widely used asset, such as a roller compactor for dry granulation. The equipment may be technically appropriate, but availability can become a bottleneck if capacity requirements are not discussed and scheduled early. In sterile manufacturing, the decision to begin on a RABS line or move to an isolator line can similarly affect process understanding, intervention strategy, capacity and future manufacturing plans.
The common thread is a shared understanding of risk. It is simple in principle but challenging in practice. A sponsor and CDMO must be aligned not only on the desired timeline, but also on the assumptions beneath it: API availability, material sourcing, formulation maturity, outsourced testing, equipment access and the trigger points at which the program needs to change direction.
For a sponsor starting a development program, three priorities stand out for the first 90 days:
- Secure and communicate the API plan. Ensure API availability is aligned with the anticipated drug product schedule, recognizing that the drug substance process may still be evolving. Delays or physical changes in API can cascade into formulation, excipient selection and manufacturing activities.
- Establish an integrated development roadmap. Give the CDMO a clear view of the clinical program, upcoming batch requirements and the intended level of formulation maturity at each stage. Agree what is phase appropriate now, what will need to change later and which decisions are intended to be locked.
- Map hand-offs and dependencies. If the API will be micronized, converted to an intermediate or processed by another specialist provider before drug product manufacture, align the schedules and change-control expectations across all parties. Timelines must connect, but so must the understanding of how a change at one stage affects the next.
The evolving CDMO role
As resilience becomes a more prominent strategic priority, CDMOs will be judged not simply on the number of sites in their network, but on the consistency and usability of that network. Backup capacity has limited value if sites are not aligned in quality standards, regulatory readiness, technical capabilities and operating practices.
For sponsors, the key assessment is therefore deeper than footprint. Can the CDMO provide appropriate development expertise now? Can it access or coordinate the materials, specialist tests and manufacturing technologies needed for the program? Does it have realistic alternatives if a site, supplier or laboratory is disrupted? And are its sites sufficiently harmonized for a future transfer to be credible?
Supply-chain disruption is unlikely to disappear as a strategic concern. The more useful response is to treat resilience as a design principle that runs through development rather than a late-stage insurance policy. When sponsors and CDMOs make supply-aware technical choices early, retain practical options, plan dependencies openly and align on risk, they are better positioned to protect both development timelines and the future continuity of supply.